getting pipes straightened

There were many challenges in getting the pipes into position, one of the main ones being the driver turned up asking, ” where’s the forklift”, so after much debate, and discussing who on earth we could lift or roll the 2 x 100m coils (250kg+ each) mdpe 125mm OD 109.5mm ID, we managed to stop a forestry lorry and very quickly he off loaded the coils with the hydraulic arm. We could then tow the coils across the grass…

Straightening out the pipes was the next challenge and after some trial and error and a screw up in kinking the pipe a little (no major damage) we figured it out and towed it down the garden with the volvo. The best way to imagine it is to lift a slinky up and then pull it,

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s