Pulling heavy pipes up to 8.5m head over 120m length

 

It was a case of crossing the problem when we reached it, but the 250kg length of pipe couldn’t be man handled so we devised a system of pulleys connecting back to the drive and volvo towing it. Progress was slow and steady, managed to get them into place with no damage and without needing to cut them… success

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s